Big jobs that take weeks without losing the thread.

Pool builds, full renovations, heater-and-automation packages — anything that spans phases, crews, and weeks. Convert from an approved estimate, break it into phases with their own billing milestones, track change orders, and run it to completion without the whole thing slipping through the cracks.

See how it works

No credit card required · 14-day free trial · Cancel anytime

app.getpoolsurf.com
Projects
Reyes Residence · Full Pool Rebuild
Project P-0142 · 412 Magnolia Ct · Started Mar 18
In progress
Contract total
$0
incl. 2 change orders
Progress
0%
Billed
$0
3 of 5 milestones
Target finish
May 9
On schedule
Project phases
5 phases · 4 crews · 12 tasks
Demo & excavation
Complete
Excavation crew · Mar 18 – Mar 22
$6,800
✓ Deposit · invoiced
Plumbing & rough-in
Complete
Mike R. · Luis G. · Mar 23 – Mar 29
$9,200
✓ Phase 2 draw · invoiced
03
Gunite shell
In progress
Gunite sub · Apr 3 – Apr 8
$13,800
Phase 3 draw · ready
04
Tile, coping, deck
Scheduled
Sarah P. · Apr 15 – Apr 24
$10,450
Phase 4 draw
05
Plaster, fill & start-up
Scheduled
Plaster crew + Jake T. · Apr 28 – May 9
$8,000
Final balance
Change orders
2 signed
CO-01 · Upgrade to variable-speed pump
Signed Apr 1 · +$1,450
CO-02 · Add automation controller
Signed Apr 6 · +$2,100
Open tasks
3 of 12
Pull deck permit
Due Apr 12 · Jen
Order tile (ready Apr 14)
Due Apr 10 · Mike
Schedule gunite inspection
Due Apr 8 · Jen
Milestone ready
Phase 3 draw · $13,800. One click to invoice.

Everything you get with Projects

Built by people who've actually run the truck. Every benefit below came from a pool service owner who asked for it.

Phased from day one

Break a rebuild into dig, plumb, plaster, start-up. Each phase has its own start date, tasks, tech, and status. You see the whole job without losing the sequence.

Approved estimate becomes a project

One click turns a signed estimate into a project with phases and line items pre-loaded. Big jobs start structured instead of as a pile of notes.

Billing milestones built in

Deposit on approval, draw on each phase, final on completion. Milestones live on the project and invoice when their phase closes. No forgetting to bill the plaster draw.

Change orders, without the paperwork

Customer wants to upgrade the automation mid-build? Add a change order, get a signature, and the contract total updates. Every change is signed and dated.

Progress you can actually show

Percent complete rolls up from phase status. When the customer asks "where are we?" you pull up one screen instead of calling the lead tech.

Tasks for the long tail

Permits, inspections, equipment orders — all the side-quests of a build live as project tasks with due dates and owners. Nothing slips because someone forgot.

Multi-crew schedule

Plumbers Monday, gunite crew Wednesday, plaster next week. Each phase drops onto the main calendar under the right crew so nobody pulls up to a site that isn't ready.

One record, start to finish

Draft → approved → in progress → completed → invoiced. Estimate, work orders, tasks, photos, change orders, invoices — all under one project number.

The difference, in plain English

Running a pool company before and after Projects.

Before

How big jobs go sideways

  • A 40-day rebuild tracked in a group text
  • Forgetting to bill the plaster draw until a month later
  • Change orders that never get signed, then disputed
  • Customer calling for a status and you have no idea
  • Permits and inspections falling through because nobody owns them
  • Crews showing up on the wrong day for the wrong phase
After

With PoolSurf

  • Every project phased, scheduled, and progress-tracked
  • Billing milestones fire the invoice when each phase closes
  • Change orders signed on the driveway, not lost in a text
  • One screen shows the customer where the job really stands
  • Tasks keep permits, inspections, and orders owned
  • Crews only see the phase they're on — no wrong-day mix-ups

How it works

Three steps from "we should try this" to running it across the whole crew.

01

Convert or build

Promote an approved estimate to a project, or start one from scratch. Set the phases, the crew, and the billing milestones.

02

Run the phases

Each phase gets its own schedule, techs, tasks, and status. Change orders slot in when the scope shifts.

03

Close and invoice

Phase closes, milestone fires, invoice drafts. When every phase is done, the project is paid and archived.

Frequently asked questions

The stuff pool service owners usually ask about Projects.

How are projects different from work orders?

Work orders are for single-visit or short repairs. Projects are for multi-phase, multi-week builds and renovations with their own billing milestones, change orders, and crews. Same system, different pace.

Can I convert an approved estimate into a project?

One click. Line items, customer, site, and signed total all carry over. You pick how to break it into phases and you're running.

Do change orders need a new signature?

Yes. Any change order goes out with its own public link for the customer to sign. Once signed, the contract total updates and the work is authorized.

How does billing work across phases?

Set milestones on the project — deposit, per-phase draws, final. When a phase closes, its milestone is ready to invoice. You approve, it goes out.

Can I assign different techs to different phases?

Absolutely. Each phase has its own crew. Plumbers on phase one, plaster crew on phase three, automation tech on start-up. The schedule reflects who's on what, when.

Ready to stop drowning in paperwork?

Join the pool companies who switched to PoolSurf and finally took their Fridays back. Fourteen days free. No credit card. Cancel anytime.

No credit card required · Free 14-day trial